Kai-Yen Wang

Document Type

Thesis - Open Access

Award Date

1969

Degree Name

Master of Science (MS)

Department / School

Civil Engineering

Abstract

The purpose of this study was to find the relative position of piles to the pier so the maximum reduction of the scour could be obtained. The study was made by using one cylindrical pier. A pile or a cluster of three piles was placed directly in front of the bridge pier to reduce the depth of scour. The centerline of the bridge pier and pile or piles was aligned with the direction of flow. Four flow conditions, with the Froude number ranging from 0. 138 to 0.47, were studied.

Library of Congress Subject Headings

Bridges -- Foundations and piers

Format

application/pdf

Number of Pages

55

Publisher

South Dakota State University